Analysis of congestion management using generation rescheduling with augmented Mountain Gazelle optimizer

Chidambararaj Natarajan, Aravindhan Karunanithy, S. Jothika, R. P. Linda Joice

Abstract


This study presents an original blockage of the executive’s approach utilizing age rescheduling with the augmented mountain gazelle optimizer (AMGO). Enlivened by the versatility of mountain gazelles, AMGO is applied to enhance age plans for a reasonable power framework situation. The strategy successfully mitigates clogs, taking into account functional imperatives, market elements, and vulnerabilities. Recreation results show AMGO’s heartiness, seriousness, and proficiency in contrast with existing strategies. Notwithstanding its heartiness in blockage the board, the AMGO presents a state-of-the-art versatile element, enlivened by the spryness of mountain gazelles, empowering constant changes in accordance with developing power framework conditions and contrasted and genetic algorithms and PSO. The review adds to propelling streamlining methods for clogging the executives, offering a promising device for improving power framework, unwavering quality and productivity.

Keywords


Augmented mountain gazelle optimizer; Congestion management; Generation rescheduling; Grid reliability; IEEE-57 bus system; Power system optimization

Full Text:

PDF


DOI: http://doi.org/10.11591/ijict.v15i1.pp57-65

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Chidambararaj Natarajan, Aravindhan Karunanithy, S. Jothika, R. P. Linda Joice

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

The International Journal of Informatics and Communication Technology (IJ-ICT)
p-ISSN 2252-8776, e-ISSN 2722-2616
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).

Web Analytics View IJICT Stats